Petdeals.io / Dog Products
Long Training Lead — 30 ft, Waterproof

$37.99
Member price $33.43 with a free account.
In stock
Thirty feet of lead for recall training — the distance where a dog actually has to choose to come back, rather than just following you. Waterproof coating, so it doesn't soak up mud, pond water or smell. Rinse it off and hang it up. Heavy-duty clip. Never wrap a long line around your hand. Let it run.
Everything ships from the US. 30-day returns. Free shipping over $35.
More in Dog Products
- KONG Scrunch Knots Squirrel — Small/Medium, Plush Dog Toy with Knotted Rope Inside $19.99
- Halti Training Leash — Large, Cobalt Blue, Double-Ended, 6.6 Feet $31.99
- Agility Course Set — Weave Poles, Jump & Tire Jump $222.99
- Nylabone Teething Bone — Medium, Chicken Flavor, Puppy Chew Toy $10.99
- Gravity Water Station — 3 Gallon, BPA-Free $94.99
- PetFusion Pet Blanket — Large, 53 by 41 Inches, Gray Plush $35.99
- Treat-Dispensing Puzzle Ball — Adjustable Difficulty, Large $27.99
- Pumpkin Hat and Scarf Costume — Cats and Extra-Small Dogs $14.99
- Max and Neo Martingale Collar — Medium, Black, Nylon $30.99
- MidWest Dog Crate Cover — Fits 36 Inch Crates, Gray Geometric Pattern $51.99
- Blaze Orange Reflective Dog Vest — Medium, Waterproof $32.99
- Paw Print Christmas Ornament Kit — Makes 2, Air-Dry Clay, Stands and Letter Stencils $30.99